Temporary Works, High Holborn, London

Temporary Works, Holborn Temporary Works, Holborn        

Temporary works in the form of flying shores between two party walls across a site. Approximately 30 tonnes of bespoke fabricated steel was used. Apparently it was more cost effective than using a proprietary system. With a design life of only three months, surely legislation must eventually change the economics of this scenario.

Architect Barton Engineers

Other Project Credits
Main Contractor Wiltsher Construction Ltd
Steelwork Subcontractor Linkweld Ltd